A staged plan: now, next and later
Get a staged plan
Tell us what your inspection report flagged, or ask for a Level 2 if you do not have one yet. We call back to go through the stages.
A staged plan, in brief
Most plans take this shape. Stage one is anything that makes the fireplace unsafe to light: broken or missing flue tile, a blocked passage, a gas unit venting badly, heavy tar buildup. Stage two is water: a failed slab at the top, open mortar joints, worn metal at the roof line, a flue with nothing over it. Stage three is draft and comfort: a damper that leaks air, a fireplace that smokes on windy days, an opening that would work better closed in with a sealed gas heater.
The fireplace stays out of use until stage one is finished. Stages two and three follow on a timetable you set, and nothing in a later stage begins without your sign off. Each stage is priced by itself, so you see what the first round costs before you commit to the rest.
- Stage one: hazards that stop the fireplace being used
- Stage two: water reaching brick, roof framing or the attic
- Stage three: draft, smoke on windy days, heat and looks
What "not up to code" usually means
When a report says a chimney is not up to code, it usually means it falls short of NFPA 211, the fire code written for chimneys and fireplaces, or of the building code in force when the house was built. On older houses around Lynwood the usual reasons are gaps in the flue tile, no cover on top, a damper that will not close, too little space between the chimney and the wood framing, or a gas appliance venting into a flue of the wrong size.
Some of those are hazards and some are wear. The staged plan sorts them, so the hazards get handled first and the wear gets scheduled.
Where the figures come from
This site publishes figures for the stage items that come up most and vary least: a cover for the top of the flue, finding and stopping a leak, a saddle on the roof behind a wide chimney with or without new metal at the roof joint, and closing an open fireplace with a sealed gas heater. Those figures are below.
Other work, such as recasting the top slab, relining the flue, damper repair, a new chase top or roof metal replaced without a saddle, depends on measurements we take on the roof, so each goes on the plan as a written figure with what it covers. You hold the whole plan on paper before stage one begins.
Published figures for common stage items
These are this site's prices. Anything your plan needs that is not listed here carries a written figure instead.
- Camera survey that sets the plan
- $385
- Finding and stopping a water entry
- $550 to $3,300
- Roof saddle to split the runoff
- $440 to $990
- Roof saddle and replacement metal at the joint
- $660 to $1,650
- Open hearth closed in with a sealed gas heater
- $2,750 to $5,500
- Top cover with mesh, fitted
- Quoted after we measure
Where a range is shown, size, height and roof access decide the point within it, measured on the visit.
Questions about staged repairs
Can we use the fireplace between stages?
Not until stage one is finished. After that, yes: stages two and three deal with water and draft, which matter but do not make a fire unsafe by themselves. If a later item changes that, we tell you.
Does each stage take one visit?
Usually. Some stage two work waits for a dry spell, because fresh mortar and sealers need one.
We are selling. Does a staged plan still help?
Yes. Every item carries its own figure, so buyer and seller can agree which ones are done before closing and which are settled another way.
Should the flue be filmed again once the work is done?
It is optional. When stage one involved work inside the flue, a camera pass afterwards records the finished result, which some owners like to keep on file.
Why does a sealed gas heater sit in stage three?
Because it cures a draft problem rather than a hazard. A fireplace that smokes because the opening is too big for the flue stops smoking once the opening is closed and the exhaust has its own pipe. That is an upgrade, so it waits until safety and water are dealt with.
Holding a failed report?
Use the contact page to tell us what the report listed. We call back, sort it into stages and put a figure against each one.
Call (323) 524-3932